#CGC1517833 | 11222 Tamiami Trail E. Unit 11, Naples FL 34113 | (239) 970-8767 | (239) 259-8509 | Email
Best Western Plus, Fort Myers Beach
Description
Carmen Construction Group was entrusted with restoring the Best Western Plus on Fort Myers Beach to its pre-storm condition and beyond. The beachfront hotel sustained extensive wind and storm surge damage from Hurricane Ian, with water levels exceeding 20 feet. Impacts included structural and roofing failures, damaged exterior cladding, and significant interior flooding across guest rooms and common areas. Construction included a comprehensive renovation, encompassing the repair and replacement of critical structural components, installation of a high-performance roofing system, and a complete interior transformation featuring refreshed guest suites with durable, coastal-grade finishes. Common Areas, including the lobby and dining area, were upgraded with new millwork, resilient flooring, and enhanced MEP systems designed to improve storm resilience. With careful project management, safety compliance, and coordination with local officials, Carmen Construction delivered a fully restored, code-compliant hotel ready to welcome guests back to Fort Myers Beach.
- Carmen Construction served as Construction Manager at Risk (CMAR), providing preconstruction services, construction management, and general contracting for the ownership group.


